Configuration Of Island Operation; Communication With The Installation Equipment - Ingeteam INGECON EMS Manager Manual De Instalacion Y Uso

Ocultar thumbs Ver también para INGECON EMS Manager:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 55
Ingeteam
Parameter
Load ID
Phase
Pnom (W)
Pgrid (W)
Priority
OnOffTimeOut (s)
All other parameters must be configured with null value. When the configuration is complete, select Save.
Load statuses
A single load can be configured in three operating statuses. This configuration is established in the weekly table in
the Loads tab, selecting the desired status at fifteen-minute intervals. Right-click on the selection and indicate:
Disconnected: load disabled.
Connected: the load will be enabled, regardless of the generation available.
Auto: the load will be enabled provided the excess renewable generation is greater than the rated power
of the load (Pnom) and considering the permitted grid power parameter (Pgrid) when the load remains
connected.

6.8.2. Configuration of island operation

Select New, and then OffGrid in the Load Type list, and configure the parameters shown below.
Parameter
Alias
Load ID
When the configuration is complete, select Save.

6.9. Communication with the installation equipment

If you want to make a direct connection with a device in the installation via INGECON SUN Manager software, you
need to follow these steps with INGECON EMS Tools.
1.
Access the plant in installer mode (see section "6.4. Plant access in installer mode").
2.
View the plant's communication's diagram, (Control panel > View > Communications Diagram).
3.
Stop the system control (Control bar > Control > Stop control).
4.
Select the communication's card with which you want to connect and click on the right properties panel
icon that
gives direct access to INGECON SUN Manager.
5.
INGECON SUN Manager is automatically opened with the selected connection.
6.
Once you have finished your consultation, close the INGECON SUN Manager and re-stablish the plant
control from INGECON EMS Tools (Control bar > Connect).
54
INGECON EMS Manager digital output to which the load (1 or 2) is connected.
Indicate the phase to which the load is connected (R, S or T). Controlling of three-phase loads is not
allowed.
Rated power of the load.
Parameter for the Auto configuration status (see "Load statuses" in this section). Indicate the
maximum grid consumption power permitted to keep the load switched on when the excess
generation is not enough.
In the case of having two controllable loads, indicate their priority. Otherwise, specify 1.
This parameter is for the loads configured in Auto status (see "Load statuses" in this section),
which have high consumption peaks when switched on. During the interval indicated, additional
consumption from the grid is not taken into account.
Indicate a name for island operation.
INGECON EMS Manager digital output to which the contactor for island operation (1 or 2) is
connected.
Description
Description
AAX2019IQM01_A - Installation and usage manual
INGECON EMS Tools