Assembly; Preparation; Base Frame - SenerTec Dachs MSR2 Instrucciones Para El Montaje, Puesta En Marcha Y Manejo

Ocultar thumbs Ver también para Dachs MSR2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.Assembly

3.1 Preparation

Screw the threaded rods (from accessories kit) into
the welded nuts on the front of the accumulator,
and lock them with a 13 mm nut.
Fit a nut on each threaded rod (Fig. 3.1)
GB
Close the front insulation of the accumulator.
Note:
Adjust the nut distance in a way that the base fra-
me lies on the isolation of the buffer vessel with its
outer edges (fig. 3,1).
Important:
Check whether the potential equalisation has benn
established at the buffer vessel!
(lateral cut: 1 x 6 mm²)

3.2 Base Frame

Remove the transport protection (cable ties)
between base frame and cover plate
(Fig. 3.2).
Remove cover plate from the base frame.
Mount the base frame to the threaded rods
using two 13 mm nuts (from accessories kit)
(Fig. 3.3.).
20
english
c. 90 mm
Fig. 3.1: Nut spacing
Fig. 3.2: Transport protection
Nuts 13 mm (M8)
Fig. 3.3: Base frame

Publicidad

Tabla de contenido
loading

Productos relacionados para SenerTec Dachs MSR2

Este manual también es adecuado para:

Se30

Tabla de contenido