Ingeteam
2.
On the second screen you select the language to view the display menus.
Highlight the desired language via the keys
3.
From this menu you can select the current date and time. Upon accessing the year flashes. Change with
the keys
and
minutes and seconds.
4.
Here we select the country or regulation governing the inverter.
Once a general visual inspection, wiring check and sealing check have been carried out, connect power to the unit
(DC and AC).
In the first inverter connection a number of screens appear in which you must select, in this order, language,
country and applicable standards. After its configuration a feedback screen appears with the options selected.
After this first configuration, select Main menu > Start/Stop > Start, thus starting the inverter. If it does not
connect, open the installation switch and check the polarities of the PV array.
42
Please, select an option
Please, select an option
. Press
to go on to select the date. Follow this process to select the day, time,
and
and press
.
ABE2013IQM01_A - Installation and Operation Manual
First connection to the grid