Maintenance Schedule - Parkside PSE 2800 A1 Instrucciones De Utilización Y De Seguridad

Generador eléctrico
Ocultar thumbs Ver también para PSE 2800 A1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Anleitung_4152413:_
22.10.2010

11. Maintenance schedule

Please adhere to the following maintenance periods in order to ensure a failure-free operation.
Important. The equipment must be filled with engine oil and fuel before it is started.
Before each
use
Checking the
engine oil
Changing the
engine oil
Checking the air
filter
Cleaning the air
filter
Cleaning the
petrol filter
Visual inspection
of the equipment
Cleaning the
spark plug
Checking and
readjusting the
throttle vale on
the carburetor
Cleaning the
cylinder head
Set the valve play
Important: The positions marked with "x*" should only be carried out by an authorized dealer.
13:03 Uhr
Seite 51
After an
After an
operating
operating
period of 20
period of 50
hours
hours
x
For the first
time, then
every 50
hours
x
x
Distance: 0.6
mm, replace if
necessary
After an
After an
operating
operating
period of 100
period of 300
hours
hours
x
Change the
filter insert if
necessary
x
x
GB/
MT
x*
x*
x*
51

Publicidad

Tabla de contenido
loading

Tabla de contenido