Descargar Imprimir esta página

Echo REPOWER 90080 Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

16B. (PPSR-2122/2433 Only) Loosen four (4) front handle screws (M),
two (2) throttle grip clamping screws (N) and two (2) engine fan
housing clamp bolts (O).
17A. (PPF-2100/2110 Only) Position cutting attachment upright and
rotate harness clamp, throttle grip, and engine upright on drive
shaft and in-line with cutting attachment.
17B. (PPSR-2122/2433 Only) Position cutting attachment upright and
rotate front handle, throttle grip and engine upright on drive
shaft and in-line with cutting attachment.
18.
(All Models) Tighten engine and throttle grip fasteners se-
curely.
19A. (PPF-2100/2110 Only) Install harness and position harness
clamp for comfortable operation. Tighten harness clamp screw
securely.
19B. (PPSR-2122/2433 Only) Position front handle for comfortable
operation. Tighten four (4) screws securely.
GUIDE BAR AND SAW CHAIN REPLACEMENT
Guide Bar Replacement / Installation
1.
Loosen two (2) 10 mm (13/32 in.) guide bar nuts (C) and relieve
saw chain tension turning screw (P) counter clockwise.
2.
Remove sprocket cover.
3.
Free saw chain from sprocket and remove from guide bar. If
guide bar is okay proceed to saw chain installation.
4.
Slide guide bar forward and remove from cutting attachment.
Install new guide bar sliding it onto the cutting attachment as far
as possible.
5.
Turn saw chain adjustment screw until adjusting pin (D) fits into
round hole in guide bar.
Saw Chain Installation
6.
Install new saw chain onto guide bar. Make sure cutting links
are faced toward the nose of the guide bar.
7.
Engage saw chain with sprocket.
8.
Replace sprocket cover and guide bar nuts.
P
OWER
I
I
NSTALLATION
NSTRUCTIONS
M
C
TM
P
RUNER
3
O
N
P
D

Publicidad

loading