4.5 Removing all the associations with the GP6CPL
Press and hold the
GP6CPL. The LEDs flash.
IMPORTANT: After pressing and holding the
LEDs flash. Ignore this signal and keep pressing until the three
LEDs flash.
5 - Operation
5.1 Dialogue with the electronic meter
The GP6CPL is connected to an electronic meter. A red indicator lamp confirms
the dialogue between the two appliances.
If the system is functioning normally, then the LED is on steady.
If there is a dialogue failure, then the LED flashes.
Check the connection or contact your installer.
5.2 Load Shedding
Load shedding is used to reduce the contractual demand of the mains supply and to avoid
tripping in the event of strong current draws.
Load shedding starts as soon as the total current draw attempts to exceed the subscribed
value.
Load shedding is Cascadocyclique
In the event of overpower, GP6CPL sheds load on all the channels then gradually brings
them back into operation.
GP6CPL can perform load shedding on up to 8 channels.
Cascade load shedding: according to the power overload, the appliance returns load
to the channel in a set order: channel 1, then channel 1 + channel 2, then channel 1
+ channel 2 + channel 3, etc.
DHW (hot water tank) load is shed a last resort, when excess demand makes it
necessary.
Cascadocyclique
®
nels (cyclic) and adjusts the number of channels on which to shed load as function of the
overpower (cascade).
Cascadocyclique
®
load shedding distributes the load shedding more evenly.
button to remove all the associations of products with the
.
®
load shedding : Load shedding is performed by rotation on the 8 chan-
button for 10 seconds, the OK
- 24 -
,
and
OK
OK
OK OK