Weq PLC11-01 Guía De Instalación, Configuración Y Operación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

To correctly install module PLC11-01, follow the steps below:
Step 1: With the inverter de-energized, remove the front cover of the CFW-11
(figure 2);
Step 2: Carefully plug-in the module into slot 3;
Step 3: Place and tighten the grounding screw and fixture of the module (figure 3);
Step 4: Set the module switches as shown in the item 2.
a
c
b
Figure 2: Removal of front cover
a
b
Figure 3: Installation of the accessory into slot
2

Publicidad

Tabla de contenido
loading

Tabla de contenido