Connection Notes; Mains Connection And Line Protection; Block Diagram - Leuze electronic MSI-FB-PB-100 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3. Connection notes

3.1. Mains connection and line protection

CAUTION: Never work when voltage is present!
Danger!
• The rated control supply voltage and control voltage inputs must be operated with power supply
modules in acc. with DIN 19240 (max. 5% residual ripple)!
• In order to avoid the inductive or capacitive decoupling of disturbing pulses with long control lines, we
recommend the use of shielded lines.
If you want to clamp two conductors under one terminal point, you must use a
conductor with the same conductor cross-section.

3.2. Block diagram

(Fig.2)
3.3. TBUS Connection system
The TBUS DIN rail connector makes the communica-
tion possible between fieldbus modules and the MSI
safety controller.
Plug the required number of TBUS (AC-MSI-TC,
order no.: 547823) together and press them into the
DIN rail (Fig. 3).
Installation/removal of the devices on the TBUS may
only be performed when no voltage is applied. When
placing the MSI-FB-PB100 onto the DIN rail, pay
attention to proper orientation to the TBUS.
20
U
GND
S
24V
DC
B-Line
3
4
RTS
GND PB
5
PB
5V PB
6
A-Line
8
EPROM
MSI-
Port
Reset
µController
T O
U
O
S
Status
A
TBUS...
B
D
IN1
IN2
IN3
IN4
IN
IN5
IN6
IN7
IN8
O1
O2
OUT
O3
O4
MSI
TBUS
Fig. 2
C
1
2
3
4
5
1 = 24 V DC
2 = GND
3 = CAN
4 = GNDbus
5 = Ubus
Fig. 3

Publicidad

Tabla de contenido
loading

Tabla de contenido