Handling And Installation Procedures; Preliminary Operations - DAB FEKAFOS 1200 Instrucciones Para La Instalación Y El Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. HANDLING AND INSTALLATION PROCEDURES

This installation document relates to the following types of tanks and specific uses:
Type of tank:
FEKAFOS 1200-3800
FEKAFOS MAXI 1200-3800
Tank type used:
• Always full
• Full and empty
• Lifting
• Above ground
3.1

PRELIMINARY OPERATIONS

ENGLISH
LEGAL OBLIGATIONS
Throughout all operations, compliance with Italian Legislative Decree 81/2008
and subsequent amendments and additions on the safety of temporary and
mobile worksites is compulsory. Before installation, inspect the tank carefully
for damage.
HANDLING AND USE
Sling the tank with ropes of suitable load capacity, or use the eye-bolts
provided for lifting. The lifting and handling equipment used must have suitable
load capacity and must meet the current legal requirements. Do not install the
tank close to heat sources. During handling, place suitable warning signs
around the operating area.
LOADING AND UNLOADING
Loading and unloading must be carried out with care: tanks must not be
dropped or slid along the sides of the truck during loading and unloading but
must be lifted and deposited with great care. Do not stack tanks during
storage as this may damage them.
23

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fekafos 3800Fekafos maxi 1200Fekafos maxi 3800

Tabla de contenido