With Accessory Storage Drawer; An Accessory Storage Drawer); Standard Mount; Flush Mount - GE Advantium CSB923 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Preparation with Accessory Storage Drawer
Preparation with an Accessory Storage Drawer
As needed, see the Standard Mount Installation Preparation OR Flush Mount Installation Preparation for
configuration details. Note the modified cutout height below.
PREPARE THE OPENING (cont.)
The Advantium Built-In Oven can be installed in combination with other GE Appliances/Monogram appliances.
Always follow each product's Installation Instructions to complete the installation.
Single Advantium Built-In Oven Installation:
Order a 30 wide single oven cabinet or cut the opening in a wall to the dimensions shown.

STANDARD MOUNT:

30
23-1/2
25-1/4
Min.
21
36-3/4
Min.
Dimension
1/8"
Reveal
K
30"
8
Construct
solid bottom - Min.
3/8" plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
1/4"
Reveal
30-1/4"

FLUSH MOUNT:

23-1/2
K*
24
36-3/4
Min.
• Allow 2-1/8 case trim overlap on the sides, 2-1/4
overlap on the top and 1 overlap on the bottom of the
opening for all models.
• Oven overlaps will conceal cut edges on all sides of
the opening.
• When installed over a single oven or a warming
drawer, allow at least 2 between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium Built-In Oven and the other
appliance overlaps.
• The support must be level and rigidly mounted, flush
with the bottom edge of the cutout.
Construct
solid bottom - Min.
3/8" plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
31-2000356 Rev. 0

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido