Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 14
Installation tool/ Installation sequence
Dimensions
The panel is movable 00 mm downward.
The stated dimensions refer to the highest position of the panel.

Technical Data

Note
Points out information to the affected personnel, whose content
is important and must be taken into consideration.
Water connection
Warm water
Water connection
Cold water
Installation sequence
Silicone (free from acetic acid!)
Observe all current and water lines when
drilling!
Technical Data
Operating pressure:
Recommended operating pressure:
Test pressure:
Hot water temperature:
Recommended hot water temp.:
Connections
Rate of flow by 0, MPa:
hand shower
body showers, _1a pieces
overhead shower
overhead shower + body showers
hand shower + body showers
Flow heater
Applicable for flow heaters at min. 4 kW and 0,15 MPa flow pressure before the
Shower panel and a minimum through flow of 7 l/minute. Only one consumer possible,
not two simultaneously.
Pressure differences
The pressures of the cold and hot water connections must be balanced.
10
English
max. 1,0 MPa
0, - 0,5 MPa
1,6 MPa
max. 80° C
65° C
G 1/
15,4 l/min
14,5 l/min
1,7 l/min
0,5 l/min
1 l/min
non return valve
The non return valves must be checked regularly according to DIN EN 1717 in
accordance with national or regional regulations (at least once a year).
Wall mount (see page 64)
Corner installation (see page 68)
Special accessories
corner fitting set (61X000 ) order as an extra
Installation Instructions
Check for required minimum height of 00 mm from shower tray floor
before starting installation
The indicated installation dimensions apply to a person that is about
1,8000 mm tall. If the dimensions have to be adapted to shorter or
taller persons, you must make sure that the minimum tub standing height
of ,00 mm will also change. This will also alter the connection and
boring hole dimensions.
Gloves should be worn during installation to prevent crushing and
cutting injuries.
Where the contractor mounts the product, he should ensure that the
entire area of the wall to which the mounting plate is to be fitted, is flat
(no projecting joints or tiles sticking out), that the structure of the wall is
suitable for the installation of the product and has no weak points. The
enclosed screws and dowels are only suitable for concrete. For another
wall constructions the manufacturer's indications of the dowel manufac-
turer have to be taken into account.
The mesh washers must be installed to protect against incoming dirt by
pipework. Incoming dirt can impair the function and/or lead to dama-
ges on functional parts of the fixture; HansGrohe will not be held liable
for resulting damages.
The arm of the shower head is intended only to hold the shower head.
Do not load it down with other objects!
Important! The fitting must be installed, flushed and tested after the valid
norms.
Operation (see page 74)
The shower system may only be used for bathing, hygienic and body
cleansing purposes.
Children as well as adults with physical, mental and/or sensoric
impairments must not use this shower system without proper supervision.
Persons under the influence of alcohol or drugs are prohibited from
using this shower system.
Do not allow the streams of the shower touch sensitive body parts (such
as your eyes). An adequate distance must be kept between the shower
and you.
The product may not be used as a holding handle. A separate handle
must be installed.

Publicidad

Tabla de contenido
loading

Tabla de contenido