Sulzer 64130030 Instrucciones De Instalación página 9

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 14
13
Use the blow-out device or compressed air once again to blow out the bore holes 4 x according to the
Hilti instructions for use.
15/16 Prepare and assemble the glue gun according to the Hilti instructions for use (image 15/16).
17
The first three strokes from the glue gun serve to mix the glue components and cannot be used. The
mixing ratio is ideal when the colour of the glue liquid is pink.
18
Guide the tip of the mortar gun up to the borehole base and press the gun to fill the borehole with mortar.
19
Fill the borehole with glue up to approx.5 mm below the upper edge of the concrete base.
20
While turning lightly, insert the threaded pin into the borehole until it stops (to spread the glue in the bore-
hole). The final position is then reached!
21
Remove excess mortar
ATTENTION
Pay attention to the working time (t work) of the mortar, approx. 20 minutes.
Pay attention to the curing time, t cure according to the table!
ATTENTION
Allow the threaded pin to cure according to the prescribed cure time "t cure". The
threaded pin may not be moved and/or loaded during this cure time!
C
-5...-1
0...9
10...19
20...29
30...39
40
If necessary, position the pump base over the inserted and cured threaded pin and carefully set down.
ATTENTION
Do not damage the thread!
22
Lay a washer over the threaded pin.
Tighten the hexagonal nut with the prescribed torque. A torque spanner must be used for this.
23
Torque: M16 = ≤ 80 Nm / M20 = ≤ 150 Nm / M24 = ≤ 200 Nm
24
Completed installation of the pump base fixing system.
Remove the cartridge from the glue gun and allow to dry. The cartridge can be disposed of after it has
dried (pay attention to the Hilti instructions for use).
Screw off the tip of the glue gun and clean according to the Hilti instructions for use.
EN 5701-C
Curing time "t cure" for threaded pin: HIT-RE 500
f.
23...31
32...49
50...67
68...85
86...103
104
Pedestal base DN 100 to 800 - Installation with fixing system
t work
0...4 h
0...3 h
0...2 h
0...20'
0...12'
0...12'
Installation instructions
t cure
≥ 72 h
≥ 50 h
≥ 24 h
≥ 12 h
≥ 8 h
≥ 4 h
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

64130031641300326413003364130034

Tabla de contenido