Important Safety Instructions

SAVE THESE INSTRUCTIONS
This manual contains instructions and warnings that must be followed during the installation and operation of this product. Failure to comply may
invalidate the warranty.
• The instructions in this manual are for common rack and rack enclosure types and may not be appropriate for all mounting applications. You must
determine the fitness of hardware and procedures before mounting.
• Use of this equipment in life support applications where failure of this equipment can reasonably be expected to cause the failure of the life support
equipment or to significantly affect its safety or effectiveness is not recommended. Do not use this equipment in the presence of a flammable
anesthetic mixture with air, oxygen or nitrous oxide.
Installation
Rack Enclosures
1
For a 42U enclosure, attach the SRGROUND to the 3 indexed
horizontal beams at the top, middle and bottom of the enclosure. The
included M4 Self-Tapping Screws will go through the three clearance
holes (non-threaded) on the bar, and then into the beams of the rack
enclosure. For a 48U enclosure, attach the bar to the top and middle
horizontal beams only, as the bar will not reach all the way down to
the bottom beam.
Note: The instructions above are specific for mounting in Tripp Lite SR42UB and
SR48UB SmartRack™ Enclosures. Mounting in other enclosure brands is possible,
but will vary depending upon the application. Several holes are provided along
the grounding bar that will allow for a workable installation into any brand's rack
configuration.
Note: Placement will vary and depend on your particular rack configuration. It
is recommended to measure the distance between the bar and your equipment to
accommodate the length of the Grounding Straps. Once the length you need has been
determined, attach the bar in the appropriate holes in the horizontal beams.
2
Attach one end of the Grounding Strap to the bar using the included
M4 screws and washers.
3
Attach the other end of the Grounding Strap to the grounding
provision on the intended equipment.
4
Finally, attach your facility's system ground to the grounding lug at the
bottom of the bar. The lug can accommodate 2/0-14AWG wires.
42U
1
2
4
2
FACILITY GROUND