Assembly & Operation - Arrow ET2OO Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY
1 MAKE SURE YOU HAVE READ ALL SAFETY INSTRUCTIONS.
2 This tool comes completely assembled. There is no assembly required.
OPERATION
Loading your tool with nails.
1. Unplug nail gun.
2. Push in PUSHER ROD LATCH at rear of Main Frame. "I"
3. Move hook towards you to slide out pusher rod assembly. "J"
4. The ET200™/ET200220™ shoots 3 different size nails — 1" (25mm), 3/4" (20mm) and 5/8" (15mm).
5. Follow the guide "K" on the side of the main frame to insert nails in the correct track. When correctly loaded, nail points will slide smoothly on the keel of the chamber. "L"
6. Replace pusher rod assembly "E" and secure latch. (This procedure moves nails forward into firing position). Make certain that power switch is in off position. Plug power cord into outlet. Now your nailer
is in firing condition. Follow all safety precautions.
I
J
TO CLEAR AND CLEAN NAIL CAVITY
1.Unplug gun. Hold gun so that mounting screws of front cover "F" are accessible.
2.Unlock pusher rod assembly. Remove all nails in chamber. Be certain that chamber is
completely clear.
3.Remove screws "G" and take front cover off.
4.The safety slide and inside cover are now disassembled to expose nail cavity for easy cleaning.
5.Clear nail cavity. Use thin, pointed tool or nail. "H"
6.ET200™/ET200220™ SHOULD ALWAYS BE UNPLUGGED DURING CLEANING. AVOID FIRING WHEN NAILER IS EMPTY. SHOOTING BLANKS WILL
DAMAGE THE ET200™/ET200220™.
L
K
E
F
G
G
H
BACK TO
INDEX
5

Publicidad

Tabla de contenido
loading

Tabla de contenido