Enso Sleep Systems PB175 El Manual Del Propietario página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

installation guide
STEP 4
Uncoil power connection cord from
the head actuator and plug into Power
Supply.
STEP 5
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure
that the Power Supply and all attached
cords are directed toward the desired surge
protector.
STEP 6
Carefully flip the base over on to its legs. Important: Two people are
required to move the bed base. Do not drag across the floor. Do not
rest frame on its side, excessive pressure may damage the legs.
For customer support, visit www.ergomotion.com or call: 1-844-534-3676
8
STEP 7
Plug the power cord into a power source.
A surge protector is recommended.
STEP 8
Quickly test remote functions to verify proper setup before placing
mattress on base. Return the base to a flat position before placing
the mattress on top.
STEP 9
Slide the left side of the mattress retainer bar into the bracket.
Pull the retainer bar to the opposite bracket and secure the right
side.
Setup is now complete! Test all functions on remote.

Publicidad

Tabla de contenido
loading

Productos relacionados para Enso Sleep Systems PB175

Tabla de contenido