Roughing-in Dimensions
Fig.1
147 mm
108 mm-133 mm
(5-13/16")
(4-1/4" to 5-1/4")
-C-L-
*CRITICAL
LEVEL
253 mm
(9-15/16")
152 mm
(6")
(Min.)
FOR 1-1/2" TOP
SPUD FIXTURES
*Note: The Critical Line (-C-L-) on Vacuum Breaker
"
must typically be 6
(152mm) minimum above fixture.
Consult Codes for details.
Right or Left Hand Installation
TYPICAL WATER CLOSET INSTALLATION:
AFWALL
FINISHED WALL
57 mm Min.
(2-1/4")
371 mm
CRITICAL
(14-5/8")
LEVEL
-C-L-
295 mm
SEE ROUGH-IN
(11-1/2")
RECOMMENDED TOOLS; Fig. 2
1. Teflon Tape
2. Flat Blade Screwdriver (For adjusting Supply Stop)
3. Adjustable Wrench
4. Tape Measure
5. Hacksaw
6. Tubing Cutter
7. File
8. For Sweat Connection; Solder and Torch
FINISHED WALL
38 mm-127 mm
(1-1/2-5")
SUPPLY
DN 19 mm
(1" I.P.S.
For 1"
Top Spud)
6047.1x1
ROUGH-IN
DIMENSION
292 mm
-C-L-
(11-1/2")
6047.117
ROUGH-IN
DIMENSION
610 mm
(24")
6047.1x2
ROUGH-IN
DIMENSION
686 mm
(27")
TOILET SHOWN
™
SUPPLY
DN 25 mm
(1" I.P.S.)
108 mm, +/-13 mm
(4-3/4")(+/-1/2")
ABOVE
FINISHED
FLOOR
Roughing-in Dimensions
Fig.2
147 mm
(5-13/16")
6047.1x1
371 mm
(14-5/8")
-C-L-
6047.117
689 mm
*CRITICAL
(27-1/8")
LEVEL
253 mm
(9-15/16")
6047.1x2
765 mm
(30-1/8")
*Note: The Critical Line (-C-L-) on Vacuum Breaker
must typically be 6
Consult Codes for details.
Right or Left Hand Installation
TYPICAL URINAL INSTALLATION: WASHBROOK URINAL SHOWN
FINISHED WALL
57 mm Min.
(2-1/4")
CRITICAL
LEVEL
371 mm
-C-L-
(14-5/8")
295 mm
SEE ROUGH-IN
(11-1/2")
Fig.2
1
5
7
3
38 mm-127 mm
108 mm-133 mm
(4-1/4" to 5-1/4")
SUPPLY
DN 19 mm
(3/4" I.P.S.
For 3/4"
Top Spud)
295 mm
(11-1/2")
371 mm
3/4" VACUUKM
BREAKER SHOWN
(14-5/8")
152 mm
(6)
(Min.)
"
(152mm) minimum above fixture.
108-133 mm
(4-1/4" to 5-1/4")
SUPPLY
DN 20 mm
(3/4" I.P.S.)
-C-L-
ABOVE
FINISHED FLOOR
2
3
4
10'
6
M965890 Rev. 1.1 (1/19)
FINISHED WALL
(1-1/2-5")
-C-L-
8