Terminal Assignment - Lenze E94AZPP04 Serie Instrucciones Para El Montaje

Tabla de contenido

Publicidad

5.3.5

Terminal assignment

I
Tip!
Complete the wiring of the installation backplane before plugging
in the standard device. The upper terminals of the installation
backplane cannot be connected with a plugged−in standard device.
Mains
Terminal X111
(left part)
Terminal X112
(right part)
Terminal data
Device sizes 1 + 2:
flexible
with wire end ferrule
Device size 3:
flexible
with/without wire end ferrule
EDK94ZPP0364 DE/EN/FR/ES/IT 3.0
Labelling
Description
L1
Connection of the mains phases
L2
E94APNE0xx4/E94AZxPxxx4: L1, L2, L3
L3
E94ARNE0xx4/E94AZMR0xx4xDB: L1.1, L2.1, L3.1
+
Terminal for the supply−side PE conductor with M5
ring cable lug
SSP940X111
Labelling
Description
L1
Connection of the mains phases
L2
E94APNE0xx4/E94AZxPxxx4:
L3
E94ARNE0xx4/E94AZMR0xx4xDB: L1.2, L2.2, L3.2
+
Terminal for the supply−side PE conductor with M5
ring cable lug
SSP940X112
Max. conductor
cross−section
2
[mm
]
2.5
10/16
l
Electrical installation
Terminal assignment
alternatively at the bottom L1, L2, L3
Tightening torque
[AWG]
[Nm]
12
0.5 ... 0.6
6
1.2 ... 1.5
10.6 ... 13.3
5
Wiring
!
[lb−in]
4.5 ... 5.3
PZ0
PH1
61

Publicidad

Tabla de contenido
loading

Tabla de contenido