3.1 M
OUNTING THE
When choosing a location for this unit, keep in mind that maintenance will have to be performed by
the end user on a regular basis. Choose an easily accessible location and plan for a 14-in. clearance
for the door to open.
CEILING HUNG
VH0153A
14¼" clearance
3.1.1 F
-
-C
LUSH
TO
EILING
If the finishing will be done using the optional decorative finishing ring (part no. FIN-R1015), the
springs included in the optional kit should be installed before installing the brackets.
1.
Using 4 screws no. 8-18 x 0.375 in., install the brackets on the unit following the diagram below to
adapt to the thickness of the ceiling.
SCREW POSITION ACCORDING
TO CEILING THICKNESS
2.
Using 4 screws no. 10-12 x 0.625 in., install the unit between the joists. This unit is designed to fit
between 12-in. cc joists. If the joists are closer, do not force the unit in, choose an other installation
method. Should the joists be more than 12" apart, shims can be used.
Prior to painting, clean the metal housing using solvent and the plastic decorative liner using water.
U
NIT
ATTIC MOUNTED
12"
VD0466
X = 1 3/8"
X = 1 1/4"
X = 5/8"
X = 1/2"
VD0471
FLUSH TO CEILING
With optional
VD0467
decorative trim
UNDER CEILING
10"
10¼"
VH0154
X
8
WALL MOUNTED
12"
VH0152
VD0470
10"
10"