STEP 3: INSTALL FLUSH VALVE
A: REMOVE FLUSH VALVE PIECES FOR INSTALLATION.
Remove cardboard from under flapper and discard. Remove
gasket (a), locknut (b) and friction washer (c) (cardboard)
and keep for installation.
B: INSERT FLUSH VALVE INTO TANK HOLE
Position overflow pipe toward back of tank.
NOTE: Do not cover tank bolt holes with flush valve. If flush valve covers
a bolt hole, turn flush valve slightly to the right (overflow tube to the right)
to clear the bolt hole. In some cases, placing bolts in the holes first may
be necessary.
6
c
b
a
STEP 3: INSTALL FLUSH VALVE
C: USE RULER ON THE
AND ADJUST NEW FLUSH VALVE
Mark the flush valve 1" below bottom of tank lever hole.
NOTE: The top of the overflow pipe must be at minimum of 1" below
the tank lever hole.
Lever Hole
D: ADJUST FLUSH VALVE HEIGHT
Twist to unlock, pull or push to correct
height, twist to lock in place.
RED WRENCH
TO MEASURE
BOTTOM OF
TANK LEVER HOLE
1"
Adjusted
TOP OF
Height
OVERFLOW PIPE
Overflow
Pipe
TWIST
7