BATTERY INSTALLATION & REPLACEMENT
BATTERY INSTALLATION:
The meter uses 2 AA batteries. Open the
battery cover from the back of meter, then
put 2 batteries into the battery compartment.
Make sure the (+) and (-) ends of the
batteries are in the correct position. Put the
battery cover back.
BATTERY REPLACEMENT:
If there is a problem with the display, try
changing the batteries first. Open the battery
cover, remove the old batteries and replace
with new batteries. Make sure the (+) and (-)
ends of the batteries are in the correct
position. Put the battery cover back.
When changing batteries, always replace
both with new batteries. Do not mix old and
new batteries.
16