Erreka TOPO Guía Rápida De Instalación Y Programación página 11

Ocultar thumbs Ver también para TOPO:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Mounting the operator (opening mechanism up to 110º)
1 Install the operator (1) and the lever
(2).
4 Position the rod (5) and bar (6).
6
Mounting the operator (opening mechanism up to 180º)
1 Install the operator (1) and the
pinion (2). Do not tighten the nuts
yet.
4 Position the chain (5) so that the
lever (2) and arm (3) are parallel.
Tighten the nuts.
5
2 Install the double arm (3) and the
release arm (4). Tighten the nuts.
Lubricate
P189E
5 Adjust the opening stopper (7). Use
the control panel to move the gate.
7
P189J
2 Install the double arm (3) and the
release arm (4).
Lubricate
P189F
5 Position the bar (6) and adjust the
end stopper (7). Use the control
panel to move the gate.
P189P
3 Position the gate.
P189G
6 Adjust the closing stopper (8). Use
the control panel to move the gate.
Position the cover and cap.
A189A
3 Position the gate.
P189L
6 Position the cover (8) and cap (9).
7
6
9
A189C
P189H
8
A189B
P189H
8
11
P189K

Publicidad

Tabla de contenido
loading

Tabla de contenido