New Construction Assembly Instructions; Before Installation - HomeNetWerks 7130-08-BT Manual Del Usario

Ventilador de ventilación con bluetooth®altavoz y luz led
Ocultar thumbs Ver también para 7130-08-BT:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NEW CONSTRUCTION ASSEMBLY INSTRUCTIONS

NEW CONSTRUCTION – ATTACHING TO THE
JOIST

BEFORE INSTALLATION

Turn off power source. Review all safety precautions.
1. Place the fan housing next to a ceiling joist or
wall stud. The fan housing should be level and
perpendicular to the joist or stud. Allow for thick-
ness of ceiling board used in your application.
DO NOT flush mount to joist. Bottom of the fan
housing should be flush with ceiling board.
2. Before mounting the fan housing to the joist,
remove the plastic duct connector for easier
access to the mounting hole on the fan housing.
Remove the duct connector by inserting a flat
head screw driver between the plastic and metal
of the fan housing, then GENTLY pry the duct
connector off.
3. Mount fan housing to the joist or stud using long
wood screws (AA) where indicated by arrows
outside fan housing.
Hardware Used
AA
Long wood screws
1
2
3
x 2
6
www.homewerksww.com

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Productos relacionados para HomeNetWerks 7130-08-BT

Tabla de contenido