Descargar Imprimir esta página

Jacuzzi S344000 Instrucciones De Instalación página 2

Base para ducha
Ocultar thumbs Ver también para S344000:

Publicidad

Idiomas disponibles

Idiomas disponibles

4 EASY STEPS TO INSTALL YOUR NEW SHOWER BASE
STEP 1.
If the subfloor is level, no other preparation is necessary. You can proceed to install the base. If the subfloor
is not level, level shower base by spreading floor leveling compound, mortar, plaster or minimal expansion
structural foam with a density of a minimum of 5 lbs./cubic ft. EVENLY over ENTIRE area where base will
be installed. (See Figure 1.) NOTE: The compound used MUST make contact with the entire bottom
surface of the base feet. The base is NOT to be supported by the base flange.
STEP 2.
Position and install base on leveled surface over drain.
SPREAD MORTAR OR LEVELING COMPOUND ETC.
EVENLY OVER ENTIRE AREA. LIFT AND LOWER BASE
OVER CENTER OF DRAIN PIPE AND SET INTO PLACE
Figure 1
INSTALLATION INSTRUCTIONS
BLOCKING
BASE
FLANGE
USE
SCREWS
PROVIDED
GAP
STUD
INCORRECT
IMPORTANT: IF THERE IS ANY GAP BETWEEN BASE FLANGE
AND STUD OR BLOCKING, SHIMS MUST BE USED.
1/4" HIGH SHIM
FLANGE
LEVEL
*HEIGHT VARIATION FROM 5-3/4" to 6"
Figure 2A. FRONT TO BACK LEVELING
BLOCKING
SHIM
USE
SCREWS
PROVIDED
STUD
CORRECT
Figure 2B
TIGHTEN SEALING NUT
TOOL
(INCLUDED)
Figure 2C
2
TOP OF THRESHOLD
FRONT OF BASE
BASE
FLANGE
*6"

Publicidad

loading