Danze Brulée DF022124 Instrucciones De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5
2. Measure and mark with a pencil on the back
of your vanity (A) the location of the water pipes
and drain lines coming out of the wall.
3. Move vanity (A) away from the wall and cut
pipe holes on the back of the vanity (A) using a
hole saw.
4. Move the vanity (A) back to the intended
installation location, flush against the wall.
5. Check the top of the vanity (A) for level front
to back and side to side. Adjust the height level-
ers on the bottom of the vanity (A) to achieve
level if necessary.
6. Use a pencil to mark on the finished wall the
location of the wall anchor holes that are on the
back of the vanity (A).
7. Move vanity (A) away from the wall and drill
1/4" holes for anchors (C) using 1/4" drill bit.
6

Publicidad

Tabla de contenido
loading

Tabla de contenido