MAIN COMPONENTS (fig. 2)
2 

INSTALLATION

The. boiler. must. be. installed. in. a. fixed.
location. and. only. by. specialized. and.
qualified. firms. in. compliance. with. all.
instructions.contained.in.this.manual.
Furthermore,.the.installation.must.be.in.
accordance. with. current. standards. and.
regulations.
2.1 
BOILER ROOM (fig. 3)
The."RMG Mk.II".boilers.with.a.rating.of.
more.than.35.kW.must.be.equipped.with.
a.technical.room.whose.dimensions.and.
requirements.correspond.to.the.current.
safety.standards..
The. minimum. height. of. the. boiler. room.
must. comply. with. what. is. indicated. in.
fig.. 3. in. relation. to. the. overall. thermal.
capacity..
The. minimum. distance. between. the.
walls.of.the.room.and.the.external.points.
of. the. boiler. (right,. left. side,. rear). must.
not.be.less.than.0.60.m..
It. is. possible. to. place. a. number. of.
apparatus.next.to.each.other,.on.condi-
tion.that.all.the.safety.and.control.devi-
ces. can. be. easily. reached.. In. addition,.
to. circulate. air. in. the. room,. air. vents.
must.be.made.on.the.outside.walls.for.
which. the. surface. area. must. never. be.
2
less. than. 3,000. cm
. and. 5,000. cm
gas.with.a.density.greater.than.0.8.
2.1.1 
Handling (fig. 3/a)
Once.the.boiler.is.in.its.place.of.installa-
tion.and.the.packaging.has.been.removed,.
proceed. as. follows. if. it. must. be. moved.
(fig..3/a):
–. remove.the.casing.cover;
KEY
. 1. Gas.valve.with.coil.assembly
. 2. 1/2".bulb.holder
. 3. Safety.stat
. 4. Lock.out.reset.button
. 5. Main.switch
. 6. Regulation.sta.with.double.contact
. 7. Thermometer
. 8. Smoke.stat.
. . ("70 - 80 - 90 100" models)
. 9. 1/8".pressure.test.point.
. . ("110" models)
. 1 0. 1/8".pressure.test.point.
. 1 1. Burner.manifold
–. attach. the. lifting. brackets. (located. on.
the.rear.of.the.boiler).and.fasten.it.in.
2
. for.
place.with.the.screws.provided;
–. insert.two.3/4".pipes.in.the.holes.in.the.
brackets,. lift. the. boiler. carefully. and.
place.into.position.
2.2 
CONNECTING UP SYSTEM
Before. proceeding. to. connect. up. the.
boiler,. you. are. recommended. to. make.
the. water. circulating. in. the. piping. in.
H.in.relation.to.the.overall.
thermal.capacity:
–..not.greater.than.116.kW:.2.00.m
–..greater.than.116.kW.and.less.
. than.350.kW:.2.30.m
–..greater.than.350.kW.and.less.
. 580.kW:.2.60.m
–..greater.than.580.kW:.2.90.m