8 Putting out of operation

7.1 Before switching on

7.2 Welding process

8 Putting out of operation
EN - 18
1 Check that the cable assembly is firmly connected to the power source, gas
supply and coolant recirculator.
2 Ensure that all equipment parts are available and correctly positioned and
secured.
 6.1 Setting up the ABIPLAS
3 Check the function of the coolant recirculator and the flow.
4 Check that the flow of the two process gases is correct.
5 Check the setting for the maximum main current on the power source
display.
1 Open the shielding gas cylinder and switch on the power source.
2 Ignite the pilot arc.
3 Hold the welding torch just above the workpiece, maintaining a distance of
about 5 mm between the workpiece and the gas nozzle.
4 Ignite the main arc and actuate the switching element on the handle.
5 Start the welding process.
NOTICE
• When putting the system out of operation, ensure that the procedures for
switching off each of the welding system components are observed.
• As liquid-cooled cable assemblies start to leak when they overheat, the
coolant recirculator should continue running for approx. 5 min. after
welding.
1 Wait until the shielding gas post-flow time has passed.
2 Close the shut-off valve and the gas supply.
3 Switch off the power source.
4 Switch off the coolant recirculator.
®
WELD torch body on page EN-12
BAL.0092 • 2020-12-17
®
ABIPLAS
WELD

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Abiplas weld 150Abiplas weld 100 wAbiplas weld 150 wAbiplas weld 100 w mtAbiplas weld 150 w mt

Tabla de contenido