Descargar Imprimir esta página

Federal Signal SSM Instrucciones De Instalación página 5

Módulo de sincronización de luces estroboscópicas

Publicidad

Idiomas disponibles

Idiomas disponibles

D.
MOUNTING.
Mount sync module SSM to a two gang, 2-inch deep, grounded back box as shown in
Figure 3 using the hardware supplied. Select conduit entrance to the box such that there is
sufficient clearance for the wires. Use adequate lead length; excess lead length could result
in insufficient wiring space. Position wires in the box such that there is minimum stress on the
terminals.
E.
SERVICE.
The Federal Signal factory will service your equipment or provide technical assistance
with any problems that cannot be handled locally.
Any units returned to Federal Signal for service, inspection, or repair must be
accompanied by a Return Material Authorization. This R.M.A. can be obtained from the local
Distributor or Manufacturer's Representative.
At this time a brief explanation of the service requested, or the nature of the malfunction,
should be provided.
Address all communications and shipments to:
Service Department
Industrial Products Division
Federal Signal Corp.
2645 Federal Signal Dr.
University Park, IL 60484-3167
-3-

Publicidad

loading