DAB KVC Serie Instrucciones De Instalación Y Mantenimiento página 24

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 41
To obtain priming, proceed as follows:
KVC – KVCX (Fig.5) :
After having removed the cap, fill the pump slowly through the filling hole so as to discharge any air pockets

present inside.
NKV (Fig.6) :
Before filling the pump through the filling hole you must first partially unscrew the drainage pin/cap without

forcing it.
After having removed the cap, fill the pump slowly through the filling hole so as to discharge any air pockets

present inside.
Before starting the pump, close the filling cap and screw the drainage pin/cap all the way, without forcing it.

Vent by means of the screw on the part opposite the filling cap, as indicated in Fig. 6.

Fig. 5 KVC - KVCX
drainage cap
Fully open the gate valve on intake and keep the one on delivery almost closed.

Switch on and check that the direction of rotation is correct, as indicated in Fig. 1. If not, invert any two phase

leads, after having disconnected the pump from the power mains.
Once the hydraulic circuit has been completely filled with liquid, gradually open the delivery gate valve until its

maximum opening.
With the pump running, check the supply voltage at the motor terminals, which must not differ from the rated

value by +/- 5%.
With the unit at regular running speed, check that the current absorbed by the motor does not exceed the value

on the data plate.
ENGLISH
filling cap
19
Fig. 6 NKV
vent screw
drainage cap
Before filling the pump
you
must
partially
unscrew the drainage
pin/cap!!
filling cap
drainage cap

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Kvcx serieNkv serieKvc 15/30Kvc 25/30Kvc 35/30Kvc 45/30 ... Mostrar todo

Tabla de contenido