Barrel Nut
(8 used in this step)
10. Insert the 50 mm Wood Dowels (7) into the drilled large holes of Long Guardrail (P) at both ends.
Attach two Long Guardrails (P) between the Upper Posts (F and H) with the100 mm Tapping Bolts (5).
11. Attach the Mattress Side Rail (N) between the Upper Posts (F and H) with four 100 mm Bolts (1) and
four Barrel Nuts (12). Make sure the wood stoppers for slats attached on side rail are up and face inward.
12. Attach the Ladder Side Rail (M) between the Upper Posts (E and G) using four 100 mm Bolts (1) and
four Barrel Nuts (12). Make sure the wood stoppers for slat attached on side rail are up and face inward.
UPPER BUNK ASSEMBLY
⑫
Ø10 x 50 mm Wood Dowel
Ø6.5 mm x 100 mm Tapping Bolt
(4 used in this step)
1/4" x 100 mm Bolt
(8 used in this step)
11
(4 used in this step)
⑤
①
⑦