Dantherm CDP 40 Instrucciones página 7

Ocultar thumbs Ver también para CDP 40:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 20
Electrical heating coil for CDF/CDP/CDP-T dehumidifier
Terminal Rail Assembly Procedure
1. Use flat screwdriver
to remove terminal
rail blocks.
3. The terminal rail
block can also be
clipped on.
4. Place bridge in the
three blue terminal
rail blocks.
6. Glass fuse in large
terminal rail block.
10A 5x20mm
Optional -
3 phase connection
Remove the bridge from the gray terminal rail block, if a 3-phase connection is needed.
See also wiring diagram on page 45.
2. Slide additional
terminal rail blocks
into place in this
order.
5. Press bridge firmly
into place.
7. Use the control
panel to activate the
heater function.
USB
RS485
EXT RH/T
Navigate to menu °C and change the default value off
(displayed "of") to the desired start temperature, which will
activate the heater.
Find an instruction of how to operate the control panel in
the Service Manual for CDF/CDP/CDP-T.
RUN
FAIL
HEAT1 HEAT2
OK
ALARM
12V DC
7
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido