Installation; Mounting In The Niche; Projector Protection - BRIO ZX30 Información Técnica

Iluminación subacuática mediante led
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 25
Technical instructions

6. Installation

The BRIO ZX30 are installed instead of the 300W incandescent bulbs in most of swimming pool niches (in
PAR56 format) once the electrical connection is done (on projector side).
1. Mount the 4 fixing tabs (ABS or stainless steel) (A) with the 4 screws. They are placed behind the light
and cross the nut in the heatsink. Avoid to overtighten the screws, it may damage the light.
2. Put the bezel on (B). Avoid to overtighten the screws, it may damage the light
Nova / Bahia : use the supplied screws with the bezel to fix it. The screws pass through the optical unit
by the front of the light. Use the holes highlighted with C
3. You can adapt the stainless steel brackets to the niche by speading them.

6.1. Mounting in the niche

Pass the cable through the niche's cable gland then pull it through the electrical sheath. Be sure that there is
enough cable to remove the light from the niche !
Press the light into the niche after winding the cable.

7. Projector Protection

Independent protection is necessary for each BRIO ZX30 . Protection must be ensured in the secondary of
the transformer using fuses or breakers at .
BRIO ZX30
v40ML
4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pk10r007

Tabla de contenido