4
Transporting and setting up the machine
4.1 Installation location
The installation location must meet the following require-
ments:
– Stable foundation with straight, even surface (for ma-
chine weight, see section 3.1).
– Keep 30 cm work area free on both sides and in front of
the machine.
– Electricity connections easily accessible close by.
4.2 Transporting the machine
► Always wear work shoes with foot protection
when transporting the machine.
► Empty the waste container prior to each transport.
► Note the weight of the machine (see section 3.1).
► To move the machine, always use the carry handle.
► To prepare the machine for shipping (e.g. in the event of
servicing), use the transport packaging.
4.3 Unpacking the delivery
► Check the delivery for completeness (for scope of deliv-
ery, see below).
► Store away the transport packaging.
► Ensure that the operating instructions are accessible to
the user at all times.
4.4 Scope of delivery
– Automatic stripper
– Mains connection cable (10 A, 250 V)
– Additional funnel (only on the Power Stripper 6.0)
– Operating instructions
4.5 Establishing connections
► Set up the machine in the intended location.
► Insert the power cable into the mains connection sock-
et (Figure 3.1, 5) of the machine and connect it to the
power supply.
► Switch on the machine at the On/Off switch
(Figure 3.1, 2).
24
2562260000/01/10.2017