8.
INSTRUCTIONS TO ORDER SPARE PARTS
8.1 INSTRUCTIONS TO ORDER SPARE PARTS
1.- Every spare parts order must include PART CODE NUMBER AS STATED IN THE PARTS LIST.
We recommend including the MACHINE SERIAL NUMBER.
2.- The identification plate with serial and model number is located as shown in the point 2 of this
manual.
3.- Let us to know the right shipping instructions, including the wished route, the address and the
consignee complete name.
4.- Do not return the parts without authorisation, the return is done with freight prepaid.
8.2 INSTRUCTIONS TO REQUEST WARRANTIES
1.- The warranty is valid for 1 year after the purchasing of the machine, the warranty will cover parts
with manufacturing defects. In any case the warranty will cover a malfunction due to improper usage
of the equipment.
2.- In all warranty requests THE MACHINE MUST BE SENT TO ENARCO, S.A. or to an
AUTHORIZED DEALER, always including the complete address and name of the consignee.
3.- The Technical Assistance Service will immediately notify to the customer if the warranty is
accepted and, if requested, it will send a technical report.
4.- The warranty will be void if any equipment has been previously handled by personnel outside of
ENARCO, S.A. or not authorized by it.
ENARCO, S.A., reserves the right to modify any part of this manual without prior notice.
NB:
en
9.
USAGE RECOMMENDATIONS
The screeds are used for the vibration and finishing of floors. This work must be made directly on the surface
without guides. Thanks to its lightweight and to its mechanism producing a powerful vibration, the screed is
ideal to smooth rapidly and easily the floors (from 6 to 18 cm thickness) depending on the concrete type.
In order to get a good finishing of the concrete surface, we recommend following these instructions:
1.-
mass. To get a right compaction of the concrete, you should use the vibrating pokers additionally. It is
important to take references or levels out of the mass to see the level objective clearly. The marks of
the feet and the tool disappear after the last pass of the screed. The vibration wave produced, reaches
a depth of 18 cm depending on the type of concrete mass.
2.-
at the top speed and you must support the handle lightly in order to avoid the screed jumps over the
surface and does not create "waves" and "marks" with edges. Pull and push constantly the screed. It
is important to get a smooth surface. The screed must be in contact with the concrete. The screed
must not show any resistance to pulling, it must slip over the concrete. The speed to push and pull the
screed depends on the depth and the consistency of the mass.
3.-
case of the concrete is not really smooth, repeat the previous instruction.
4.-
composed of water, concrete, and small sand particles).
5.-
acting as a cinder paper for the below layers and avoids the sweating effect. The water stays in the
below layers and the surface moistens.
6.-
trowel (single or double ride-on-type) or re-vibration equipment (double roller unit with integrated
vibrating system). These machines provide a higher resistance to wearing but are not required for all
the types of floors.
10
Before pouring the concrete mass on the structure, it is necessary to level properly the concrete
When the mass is prepared, the screed is laid over the concrete mass with the motor running
To judge the quality of the vibration, the marks of the feet and the beam must disappear. In
Then, a mixture called "milk" appears on the surface (this is a mixture of 3-4 mm thickness
Water must evaporate quickly and the surface will become dull. The fine layer called "milk" is
Several hours later, the concrete is ready for additional finishing operations. You can use a
"TORNADO E-BATT" BATTERY VIBRATING SCREED