S19-320EXP120, S19-320EXP220
Installation
Step 5: Test the alarm system
NOTE: Testing the alarm for the first time using the drench shower may expose the flow switch to an
unnecessary water hammer since the downstream piping may be empty of water. The flow switch is designed to
withstand such a water hammer, but using the smaller eye wash flow is recommended. Refer to Figure 3 when
testing the alarm system.
1. Apply power to the alarm branch circuit. The alarm should remain off.
2. Make sure the alarm horn cut-out switch is in the "ON" position (pull the button out).
3. Open the eye wash valve. The alarm should sound and the strobelight flash shortly after water flows
from the system.
4. Use the alarm horn cut-off switch to silence the horn. Pushing the button should shut off the horn but
allow the strobelight to keep flashing.
5. Shut off the eye wash flow valve. The strobelight should stop flashing.
6. Reset the alarm horn cut-out switch by pulling the button out.
7. Repeat the tests in procedures 1-6 above, this time using the drench shower only.
JUNCTION
BOX
CONDUIT
CONNECTOR
TO POWER
SUPPLY
FLEXIBLE
CONDUIT
Figure 3
6
STROBE LIGHT
NIPPLE
CUT-OUT
TO FLOW
SWITCH BOX
SWITCH
7/5/07
HORN
SWITCH
Bradley Corporation • 215-1083 Rev. F; EN 07-511
NIPPLE
MOUNTING BRACKET
ASSEMBLY
U-BOLT (qty. 2)
NUT (qty. 4)
CONDUIT
CONNECTOR
JUNCTION
BOX
FLOW
Installation