Completing The Installation; Final Installation - Haier HWF05XCP Guía De Uso Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

COMPLETING THE INSTALLATION

ATTACH SIDE CURTAINS TO WINDOW
1. Pull the right-hand curtain and frame out until it fits flush to the side
of the window frame. (See Fig.17)
2. Use a 1/8" drill bit to drill a starter hole through the top hole in the
side curtain and into the window sash.
3. Insert one (1) 1" wood screws through the top hole of the right hand
curtain and into the window sash. (See Fig.18)
4. Repeat for the left-hand curtain.
5. Use a 1/8" drill bit to drill a starter hole into the window sill using the
top hole in the side curtain as a guide.
6. Insert one (1) 1" wood screws through the bottom hole of
the right-hand curtain and into the window sill. (See Fig.19)
7. Repeat for the left-hand curtain.

FINAL INSTALLATION

1. Uncoil the included foam seal. (See Fig.20)
2. Insert the foam seal behind the top of the lower window sash
and against the glass of the upper window sash.
3. Place the window lock bracket as shown in the diagram using
a screwdriver. Use a 1/8" drill bit to drill a starter hole through
the hole in the window lock bracket and into the upper window
sash. (See Fig.21)
4. Attach the window lock bracket to the upper window with one (1)
1" wood screw to secure the unit in place.
5. Plug unit into a grounded 3 prong outlet.
6. Press RESET on the power supply cord. A green light will
come on. See "Electrical Requirements" for full detail.
HOW TO INSTALL
Fig. 17
Fig. 18
Fig. 19
Fig. 20
Fig. 21
PAGE 13

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido