Elpro 7 RP
GB
PLUG-IN RADIO
CARD SUPPORT
L7
1
PROGRAMMING
P BUTTON
L1
L2
L3
L5
L4
1 2 3 4 5 6 7 8 9 10
CE DECLARATION OF CONFORMITY of the manufacturer:
Meccanica Fadini snc (Via Mantova, 177/A - 37053 Cerea - VR - Italy) declares under own responsibility that Elpro 7 RP complies with the 2006/42/CE Machinery Directive,
and also that it is sold to be installed in an "automatic system", along with original accessories and components as indicated by the manufacturing company, that is not
liable for any possible incorrect use of the product. The product complies with the following specific norms: Low Voltage Directive 2014/35/UE, Electromagnetic
Compatibility Directive 2014/30/UE. In order to certify the product, the Manufacturer declares under own responsibility the compliance with the EN 13241-1 PRODUCT
NORMS.
General description: Elpro 7 RP is an electronic control panel developed for Nupi 66. The main feature of this unit is the capability to learn the required working times
during operation (gate delay in open and close cycles, dwell time). 230 V - 50 Hz single-phase power supplied. The manufacturer is not liable for incorrect use of the
controller; and reserves also the right to change and update it to the latest standards of the art at any time.
IMPORTANT:
- The control panel must be installed in a sheltered, dry place, inside the box provided with it.
!
- Make sure that the power supply to the electronic programmer is 230 V ±10%.
- Make sure that the power supply to the electric motor is 230 V ±10%.
- For distances of over 50 metres we recommend using electric cables with bigger sections.
- Fit the mains to the control panel with a 0,03 A high performance circuit breaker.
- Use 1,5 mm² section wires for voltage supply, electric motor and flashing lamp. Maximum recommended distance 50 m.
- Use 1 mm² section wires for limit switches, photocells, push-buttons/key-switch and accessories.
- Bridge terminals 1 and 2 if no photocells are required.
- Bridge terminals 3 and 6 if no key- or push-button switches are required.
N.W.: to fit extra accessories such as lights, CCTV etc. use only solid state relays to prevent damages to the microprocessor.
WORKING LOGIC: Elpro 7 RP is supplied with pre-set working times so that to allow the first installation: working time (about 20 s), gate delay times (opening = 2 s,
closing = 6 s, dwell on automatic mode = 15 s). Once satisfied that the system is working all right, new working times can be programmed to meet the user's needs or
the installation requirements. Elpro 7 RP functions can be set by dip-switches, both before and after the times have been stored by the unit.
LEARNING THE TIMES: Elpro 7 RP learning operation is quite easy and can be achieved either by the P button on the PBC or by the remote control after entering setting.
mode, see point 1).
Starting the unit to learn the required times: with the gate in closed position pulse the equipment to one complete cycle, ie. open-stop/dwell-close
Important:
1) In order to avoid setting times which are not suitable with the correct gate functioning, some time limits were pre-set. Beyond these values the automation will start
with the maximum pre-set time: M1 and M2 motor run time (max 55 s), dwell time on automatic mode (maximum 90 s).
2) During the learning operation, no other functions can be activated, the photocells and the stop button are out of service.
3) If the new setting operation is interrupted (for example: mains cut off), the times in the previous setting are memorized.
4) Normally, not on programming mode, the P button has the same function as a remote control button and it is possible to test the system by pulsing it; the Led 7
becomes a simple indicator, the same as the indicator to terminal 8.
24 V - 3 W Indicator:
Led on = the gate is open
3
8
Led off = the gate is closed
Fast flash = closing movement
Slow flash = opening movement
Led status indication:
L1 = 230 V - 50 Hz power supply. Alight
L2 = photocells, if obstructed light goes off
L3 = open. Alight whenever an open pulse is given
L4 = close. Alight whenever a close pulse is given
L5 = stop. It goes off on pulsing stop
L6 = radio. It goes on by pressing a transmitter button
L7 = gate status and programming led
ELECTRONIC CONTROL PANEL FOR NUPI 66
WITH PROGRAMMABLE RADIO TECHNOLOGY
DIP-SWITCH
ON
OFF
2 3
4 5 6 7 8
L6
SINGLE-PHASE
MOTOR
(actuator and
electric lock if
required)
24 V low voltage
TRANSFORMER
1 2
3
4 5
ELECTRONIC TORQUE
CONTROL
11
12 13 14 15 16 17 18 19 20
M1
M2
SINGLE-PHASE
MOTOR
M1
M2
Pedestrian opening (M1 motor by open pulse):
Partial opening for pedestrians is only allowed in closed gate position
by pulsing to open (the gate closes after the dwell time if set to
automatic dip-switch 3 = ON):
- the first pulse operates 1 gate leaf (M1)
- the second pulse operates the second gate leaf
Dip-switch:
1= ON Photocells, stop during opening
2= ON Radio no reversing during opening
3= ON Automatic closing
4= ON Pre-flashing in service
5= ON Radio step by step
6= ON No delay on opening
7= ON No additional pushing on the gate leaf after closing
8= ON Pedestrian opening by open button
4
Torque control setting:
adjust torque from lower level (step 1) up to the
2 A fuse
required amount of power step by step to achieve
a correct performance of the system so that the
gates are operated as required and any injuring
hazard is prevented.
Please note, torque is to be adjusted by a
technician.
- less power
1 2
TORQUE CONTROL
+ more power
3
4 5
ELECTRONIC
Meccanica Fadini s.n.c.
Responsible Manager
ON: gate leaf for
pedestrian opening
OFF: standard operation
8
DIP-SWITCH
ON
OFF
1
2 3
4 5 6 7 8