ASSEMBLY:
Location:
1 Choose the location for the PIV W with the aforementioned conditions in mind.
2 Choose which side of the device the intake will be on, right or left, and assemble the rear
panel following figure 1 for the chosen direction. The central housing (figure 2) must be
assembled depending on the position of the back panel.
Fig 1: Back panel indicating direction of air flow
Guide:
1a If the air intake is through the side panel, use Panel
A (figure 3) as a guide, making sure the cable outlet is
as close as possible to the wall. Make sure there is
enough space around the guide to install the device
and the panels.
1b If the air intake is through the rear, use the Back
Panel / Central Housing combination as a guide.
Mark the location of the hole for the air intake on the
wall. Make sure there is enough space around the
guide to install the device and the panels (figure 4).
Mounting:
1 Cut a 107 mm hole on the marks made before. If
the air intake is on the side, the duct must be at least
as long as the thickness of the façade plus 80 mm. If
it is in the rear, it must be the thickness of the façade
plus 15 mm.
2 Put the duct through the hole and assemble the rear
grille.
Adhesive
tape
Fig 2: Central housing
Fig 3a:
Fig 3b:
Side panel with
Side panel
cable outlet
1 and 4 : Side air intake
2 and 3: Rear air intake
18