INSTALL DUCTWORK (DUCTED INSTALLATION ONLY)
1. Determine whether hood will discharge vertically
(3¼" x 10" or 7" Round) or horizontally (3¼" x 10"
only).
2. Run ductwork between the hood location and a roof
cap or wall cap.
3. Choose a straight, short duct run to allow the hood to
perform most effi ciently. Long duct runs, elbows and
transitions will reduce the performance of the hood.
Use as few of them as possible. When possible, use
at least 2 foot straight runs before any turns. Larger
ductwork may be required for best performance with
longer duct runs.
4. Install wall cap or roof cap (sold separately); ensure
there is no leak in hoiouse insulation. Connect metal
ductwork to cap and work back towards the hood
location. Use 2" metal foil duct tape to seal the joints
between ductwork sections.
1. If present, remove all protective polyfi lm from the
hood and/or parts. Using the fi nger cup, remove
the Micromesh Filters from the hood by pushing
down and tilting fi lters out.
2. Remove the EZ1 brackets from inside the hood by
cutting off the tie wrap. Remove both screws holding
damper assembly to hood. Remove parts bag
(captured behind the damper assembly). Remove
damper assembly from inside the hood and keep
the screws for further use.
S
OFFIT
C
ABINET
18"
MIN
ABOVE COOKING SURFACE
NOTE: Distances over 24" are at the installer and user
PREPARE THE HOOD
EZ1
BRACKETS
7
R
OOF CAP
3¼"
7"
ROUND DUCT
(F
OR VERTICAL
DISCHARGE
H
OOD
- 24"
MAX
discretion.
B
10"
X
OR
)
H
OUSE WIRING
(T
)
OP OR BACK OF HOOD
W
ALL CAP
3¼"
10"
X
DUCT
(F
)
OR HORIZONTAL DISCHARGE
C
SCREWS
DAMPER
ASSEMBLY