Descargar Imprimir esta página

Electrical Connection; Control Panel Operation - Liberty Pumps LSG202A Manual De Instalación

Bombas de saneamiento y trituradora omnivore
Ocultar thumbs Ver también para LSG202A:

Publicidad

Idiomas disponibles

Idiomas disponibles

IMPORTANT: For 3-phase pumps, check for proper rotation before installing pump into basin. See figure A for
proper rotation.
Fig. A – Proper impeller rotation,
three phase models
4.

Electrical Connection

AFTER THE PUMP IS INSTALLED, THE ELECTRICAL CHECKS OF SECTION 4 MUST BE
PERFORMED.
4-1
PIGGY BACK SWITCH OPERATION
1.
Plug the Piggyback switch into a 6-20R receptacle. The receptacle
must be wired to a 30-amp breaker. Be sure to have the breaker
turned off before plugging in the switch.
2.
Plug the pump power cord into the piggyback switch as shown.
3.
The pump is ready to test and your breaker can be turned on.
(Refer to section 5)
4-2

CONTROL PANEL OPERATION

The pump can run on a voltage rating of 230V or 208V. Check that it is the same as the supply voltage. The
1.
pumps are supplied with 6-20P (20-amp) cord plug ends. Most often the pump will be plugged into a receptacle.
If your pump needs to be hard wired into a panel then the plug end will have to be removed and the leads stripped
back. The connection of the pump cable leads should be carried out by a licensed electrician in accordance with
the identification on the individual leads and the corresponding connections in the control panel. Refer to the
wiring diagrams supplied with the panels.
Bottom View
ALWAYS TURN OFF BREAKERS BEFORE
WORKING ON ELECTRICAL CORDS.
BE CAREFUL NOT TO DRILL OR SCREW
INTO EXISTING WIRING.
Check to make sure installation is in accordance with the National Electric Code and
all applicable local codes. Installation and servicing is to be conducted by qualified
personnel. This pump is supplied with a grounding conductor. To reduce the risk of
electrical shock, be certain that it is connected to a properly grounded earth wire.
REFER TO WIRING DIAGRAM INCLUDED WITH CONTROL PANEL. IF THERE IS NO WIRING
DIAGRAM, CONTACT THE MANUFACTURER TO OBTAIN ONE. DO NOT ATTEMPT TO
CONNECT PUMP WITHOUT A WIRING DIAGRAM.
©Copyright 2008 Liberty Pumps Inc. All rights reserved
Check three phase pumps for proper
rotation prior to installing pump(s) in
basin. To change rotation, reverse any
two of the three power leads to the pump.
Code the wires for reconnection after
installation.
- 6 -

Publicidad

loading

Este manual también es adecuado para:

Lsg202mLsg203mLsg204mLsgx202aLsgx202mLsgx203m ... Mostrar todo