Descargar Imprimir esta página

Elkay EFHA8 1K Serie Manual De Instalación/Cuidado/Utilización página 4

Publicidad

1. LOCATE PARTS FROM PARTS BAG: GOOSENECK, SHROUD, LEVER, & LEVER INSERT.
2. ADJUST "T" NUT AT RIGHT ANGLE TO GOOSENECK HOLE AS SHOWN IN FIG. 8.
3. SLIP LEVER OVER "T" NUT BY PUSHING LEVER BACK INTO POSITION. GOOSENECK HOLE MUST BE VISIBLE.
4. INSERT GOOSENECK INTO HOLE BY PUSHING IT DOWN FIRMLY. ALIGN GOOSNECK SO OUTLET IS OVER BASIN.
TIGHTEN SET SCREW TO LOCK GOOSENECK IN PLACE.
5. SNAP SHROUD INTO PLACE OVER VALVE COVER.
6. INSTALL LEVER INSERT INTO BACK OF LEVER.
7. TURN WATER SUPPLY ON AND DEPRESS VALVE LEVER TO FILL HOT TANK. WHEN TANK IS FULL WATER SHOULD COME
OUT OF GOOSENECK.
8. INSTALLATION IS COMPLETE. PLUG HOT TANK INTO ELECTRICAL SUPPLY. HOT WATER SHOULD BE AVAILABLE IN ABOUT
30 MINUTES.
98294C (Rev. A - 11/06)
EFHA8*1K
GOOSENECK
(ITEM #33)
LEVER INSERT
SET SCREW
BASIN (REF.)
LEVER
(ITEM #34)
FIG. 8
HOT VALVE INSTALLATION
"T" NUT
VALVE COVER
SHROUD
(ITEM #35)
PAGE 4

Publicidad

loading