Operation Of The Heater - Webasto DBW 2010 Instrucciones De Uso Y Mantenimiento

Ocultar thumbs Ver también para DBW 2010:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 40

Operation of the heater

The water heater can be started via the switch or timer, depending on its
configuration.
GB
Set the vehicle heating to "warm" before switching on the heater.
General
The time when heating starts can be programmed using the standard clock
within a time range of up to 7 days. It is possible to program 3 switch-on times,
however only one of them can be activated at a time.
The standard clock has an alarm function. When the ignition is switched on, the
clock shows the current time and day of the week. The display and the buttons
are illuminated when the heater is operating.
All symbols on the display flash when the electrical power supply is connected.
The time and the day of the week must be set.
20

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dbw 2016

Tabla de contenido