MANUAL DE INSTRUCCIONES CODIGO 80359
J
.P. SELECTA s.a.u.
REV 0 Mayo 2019
7. Operation
1. Turn the power switch on and the temperature and the speed will be displayed.
2. The speed is adjusted to 0, click on the Rotation key, slowly adjust the speed,
the rotation of the agitation blade, and observe if any anomaly occurs.
3. Pour the materials into the container through solid feed or other inputs.
4. Evacuate the container according to the reaction needs. For the triple reaction
vessel, the vacuum pump can be applied to evacuate the outer layer, to achieve
the thermal insulation functionality.
5. Set the temperature control device according to the temperature shown, to
obtain the desired reaction temperature inside the container.
6. Slowly adjust the knob to achieve the desired rotation speed.
7. Let the water or coolant pass through the condenser according to the process
requirements.
8. After the reaction, first turn the heating or cooling temperature control device
function off, maintain the cycle and then close the circulation function when it
is near to the ambient temperature.
•
Note: The temperature control unit cycle is turned off. The circulation valve
can not be closed, leave it open. Otherwise, if the body of the container is too
hot or too cold, it could cause inflation and cause damages to the equipment.
9. After the speed test is set to 0, click on the key 1 minute after closing the
reactor power.
10. Open the discharge valve to discharge the materials. If necessary, the
valve parts or the sealing parts of the container should be cleaned and then
reassembled safely.
•
The glass parts must be cleaned after returning to normal temperature.
The droplets on the inside and outside should be cleaned after washing to
avoid rupture of the container, caused by an irregular temperature or by a
sudden change in temperature.
8. Maintenance
The warranty of the equipment against manufacturing problems is of 12
months from the date of purchase. If the equipment has been used improperly,
compensation for the damage caused will be charged.
Contact the Technical Service before obtaining professional maintenance to return
the equipment to the factory:
1. Clean the machine so as not to damage the maintenance personnel;
2. Provide the description of the equipment failure;
3. Pack the machine properly to avoid damage during transport.
Autovía A-2 Km 585.1 Abrera 08630 (Barcelona) España
e-mail: selecta@jpselecta.es - website: http://www.grupo-selecta.com
(Sujetas a modificaciones sin previo aviso)
Tel 34 937 700 877 Fax 34 937 702 362
Pag.: 36