1. Product selection.
Check kit selection with cable diameter dimensions in Table 1.
Table 1
Cross Section
2. Position boot; shrink in place.
Position boot tightly into crotch area.
Begin shrinking at center of boot
body, work torch with a smooth
brushing motion around all sides of
the boot.
3. Complete shrinking.
Continue to the boot body and boot
fingers as the cap shrinks and
conforms to the cable contour.
Separate individual conductors and
apply heat between them to provide
a smooth crotch.
Properly installed boot will be
smooth and conform to cables or
other substrate. Adhesive will be
visible at ends.
Installation is complete.
PII-54733, Rev AB
DCR C26724, PCN 275283-000
Effective Date: November 1994
Kit
CBR-2-1-A
CBR-2-2-A
CBR-2-3-A
CBR-3-1-A
CBR-3-2-A
CBR-3-3-A
CBR-3-4-A
CBR-4-1-A
CBR-4-2-A
CBR-4-3-A
CBR-4-4-A
CBR-6-1-A
CBR-6-2-A
Warning: De-energize circuit(s) before proceeding with installation.
Body Use Range
Min-Max
0.35-1.00" (9-25mm)
1.25-1.70" (32-43mm)
1.65-3.00" (42-75mm)
0.50-1.35" (13-34mm)
0.85-2.20" (22-56mm)
1.10-2.90" (28-74mm)
2.35-5.65" (60-144mm)
0.70-1.25" (18-32mm)
1.00-2.10" (25-53mm)
1.20-3.50" (30-89mm)
2.35-6.05" (60-154mm)
1.45-3.85" (37-98mm)
2.65-5.30" (67-135mm)
Breakout Boot
2
Installation Instructions
Legs Use Range
Min-Max
0.15-0.53"
0.30-0.75"
0.65-1.40"
0.20-0.55"
0.35-0.90"
0.50-1.25"
1.20-2.10"
0.15-0.45"
0.35-0.90"
0.55-1.40"
0.90-1.50"
0.60-1.50"
0.30-0.75"
0.90-2.20"
0.40-0.95"
© 1994 Raychem Corporation
Printed USA 11/94
(4-13mm)
(8-19mm)
(17-36mm)
(5-14mm)
(9-23mm)
(13-32mm)
(30-53mm)
(4-11mm)
(9-23mm)
(14-36mm)
(23-38mm)
(15-38mm)
(8-19mm)
(23-56mm)
(10-24mm)
1886
1887
1888