Installation
Unit with "A" Drain and IR Module Shown,
Also Available with "O" Drain
Restraining Bracket
(140-128)
Soap
Dispenser
Coupling Nut
and Set Screw
Coupling Nut
and Set Screw
21-5/8" Tie Rod
(176-008A)
Support Tube
6
Electrical connections for Adaptive Infrared
START-UP NOTE: Do not use for two minutes after making
power connection. The sensors will take up to eight minutes
(without being used) to adapt to the bowl if another object is
detected during the two-minute start-up period.
A
Attach infrared female connect wire from infrared
module to solenoid.
B
Attach the infrared male connect wire from the
infrared module to the transformer lead wire.
C
Attach the remaining transformer lead wire to the
solenoid.
D
Connect 24 VAC transformer provided to power
source.
E
Turn supplies on. Open stop valves completely.
F
Open volume control valve completely and check
piping installation for leaks.
G
Pass your hand in front of each sensor until air is
purged from the lines.
Bradley • 215-1332 Rev. V; ECN 12-00-004
Top
I.R. Valve with Thermostatic
Cover
Mixing Valve (Shown) (S45-2504)
8-5/8"
Tie Rod
Spacer
Module
Cover
4-1/4" Tie Rod
(176-118)
IR Module
Assembly
Tie Bar
Sprayhead
(S05-054B)
3/8" Tubing from
Module Female
Connect Wire
I.R. Valve with
Thermostatic Mixing Valve
(Shown) (S45-2504)
24 VAC
Transformer
(S83-134)
Valve Assembly
3/8" Tubing from Sprayhead
Volume
Control
I.R. Valve with
Tempered Line Not
Shown (S45-2505)
Do not apply pipe sealant
to compression fittings.
Sprayhead
Infrared
1/15/2013
TDB3104, WF3204
Tie
Rod
Tie Rod Nut
(110-064)
Flexible
Hose
(269-2053)
Stop
(S27-340)
Hot
Cold
Infrared Module
(S50-367)
Do not apply
pipe sealant to
compression
fittings.
Male
Connect
Female
Connect
Solenoid
Valve
I.R. Valve with
Tempered Line Not
Shown (S45-2505)
11