1
Network cable
2
Power cables
Important
The dip switches are configured with the correct PT or PTZ protocol in the factory and
must not be changed.
Note
The base unit can be attached to the bracket in four different positions.
9. Use the alignment indicators to find a suitable position that allows access to the
configuration board, which can be opened for easy access to the network connector
during for example troubleshooting.
10. If there is cable slack after the cables have been connected, loosen the cable glands,
remove the slack and attach the cable glands again.
11. Attach the base unit to the bracket.
12. Apply Loctite
®
243 threadlocker on the screws and tighten the screws (torque 4 Nm).
AXIS Q86–E Series
L
N
17