Pre-Installation Checks - RIB KING EVO Manual De Usario

Ocultar thumbs Ver también para KING EVO:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

G
INSTALLATION
B

PRE-INSTALLATION CHECKS

The leaf must be fixed firmily on the hinges to the pillars, must not be flexible during the
movement and must move without frictions.
Before the installation of KING EVO, verify all dimensions etc.
There's no need for any modification, if the gate is like that shown in Fig. 1.
Gate features must be uniformed with the standards and laws in force. The gate can be
automated only if it is in a good condition and its conditions comply with the BS EN 12604
norm.
- The gate leaf does not have to have a pedestrian opening. In the opposite case it is
necessary to take the appropriate steps, in accordance with BS EN 12453 norm (for
instance; by preventing the operation of the motor when the pedestrian opening is
opened, by installing a safety microswitch connected with the control panel).
- No mechanical stop shall be on top of the gate, since mechanical stops are not safe
enough.
FIXING THE ACTUATOR ATTACHMENT TO THE COLUMN
To obtain a correct movement of the leaf gate it is necessary to respect the measures (to
see the TABLES of the measures).
COLUMN ATTACHMENT FOR KING EVO OPERATOR
(code BA10151)
If the column is in iron, the attack can be screwed directly using four metric screws M8.
If the column is in concrete, the attack can be fixed with four expansion screws Ø 8 mm
(Fig. 2-3).
In the case you have a wall parallel with the open gate, you must provide a niche in which
to place the operator.
COLUMN ATTACHMENT FOR KING EVO L OPERATOR
(code BA10153)
To obtain a correct movement of the leaf gate it is necessary to respect the measures.
If there is an iron pillar you can weld the attachment directly.
If there is a cement pillar, you can use the fixing plate as in Fig. 5 which is fastened with 4
Fischer-screws of Ø 8 mm.
There is also the possibility to cement the attachment welding an anchor at its base Fig. 6.
Naturally you have to respect predetermined fixing measures.
Afterwards you must weld the other actuator's attachment to the gate (Fig. 8).
In the case you have a wall parallel with the open gate, you must provide a niche in which
to place the operator.
FIXING THE OPERATOR ATTACHMENT TO THE GATE
(to see the TABLES of the measures).
Before inserting the pin into the gate attachment, grease thoroughly.
Weld the base at the right height (Fig. 8).
Fix the KING EVO and try several times to open and to close the gate, controlling that the
operator does not touch the moving gate.
Parts to install according to BS EN 12453 standard
COMMAND TYPE
Skilled persons
(out of public area*)
Hold-to-run operation
Impulsive - in sight
(e.g. push-button)
impulsive - out of sight
(e.g. remote)
automatic
C and D, or E
* a typical example are those doors which do not have access to any public way
A: Hold-to-run operation made by push-button ex: code ACG2013
B: Hold-to-run operation made by key selector ex: code ACG1010
C: Adjustable power of the motor or photocells to respect impact forces as indicated in Annex A
D: Safety strips and/or other additional devices to reduce the probability of contact with the
door.
E: Devices installed in such a way that a person can not be touched by the door.
2
4
6
34
USE OF THE SHUTTER
Skilled persons
Not skilled persons
(public area)
A
B
C or E
C or E
C or E
C and D, or E
C and D, or E
3
5
7
Grease
thoroughly
Not possible
C and D, or E
C and D, or E
C and D, or E
8

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

King evo lKing evo iceKing evo l ice

Tabla de contenido