New Construction – suspended between joists
B11
F
Slide the mounting rails into brackets.
B13
F
Mark position of screws by using holes as a template.
B15
Insert screws, leaving space between the screw
head and the joist. Screws are not provided.
B12
E
Position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
B14
Drill a hole in the center of each outline.
B16
Attach the rails onto the screws.
8
42950-01 09/09/2011
5/8
1/2
1/8" bit
5/8
1/2