Descargar Imprimir esta página

Rola TOP RAIL KIT Manual Del Usuario página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

Please read all instructions carefully before assembly, installation and/or use of this product.
2
TRIM BUFFER
STRIP
3
TIGHTEN 5/16-18
LOCK NUT
(4) PLACES
ROLA LOGO LABEL
FACING OUTWARD
Cequent Performance Products, Inc.
Plymouth, MI 48170
Technical Service: (888) 521-0510
Product Name:
Attach (4) L-Brackets to truck rack crossbars:
• Remove locking end caps from crossbars.
5/16-18
LOCK NUT
• Select location of L-Brackets and plastic adapters.
Note, DO NOT extend plastic adapters past ends of
crossbars.
• Trim buffer strip to clear T-Bolts.
L-BRACKET
Note, the buffer strips tuck under the plastic adapters.
• Install T-Bolts into crossbar channels
• Install plastic adapter & L-Brackets onto T-Bolts and
PLASTIC ADAPTER
loosely install the 5/16 locknuts onto T-Bolts.
5/16-18 T-BOLT
LOCKING
END CAP
NOTE: L-Brackets can be mounted inboard or outboard
Attach Side Rail Assemblies to Truck Rack:
• Place the assembled side rails on to the plastic adapters,
against the L-Brackets.
• Secure side rails to L-Brackets using (1) Clamp Bracket,
(2) ¼-20 x .750 long hex bolts and (2) lock washers,
4 places.
• Install (2) #8 self tapping screws into the side rails as shown.
(optional)
• Adjust side rails to desired width and firmly tighten
all (4) 5/16 locknuts
CLAMP BRACKET
Page 4 of 6
TOP RAIL KIT
Product Code:
of side rails to best suit use.
¼" LOCK WASHER
¼-20 X ¾" HEX BOLT
#8 x 5/8" TAPPING SCREW
59798N
59798
Rev D 5-26-15
Printed in China

Publicidad

loading

Este manual también es adecuado para:

59798