ENGLISH
1) INSTALLATION INSTRUCTIONS
2) ECLAIR XL
3) PRECAUTIONS FOR USE (The product guarantee depends on the respect for these rules)
INSTALLATION and START UP
For products delivered with filters, these must be installed in accordance with the instructions.
Before commissioning any of our valves, it is essential to carefully drain
the pipes that can damage the mechanisms or water passages (PRESTO® heads that can be dismantled from front).
Recommended operating pressure according to NF EN 816: 1 to 5 bars.
CLEANING
The chrome-plated coating of PRESTO® valves must be cleaned only with soapy water.
Abrasive, acid, alkaline or ammonia-based household products are prohibited.
4) EN 12541 compliance
13012 Eclair XL polished chrome-plated with stop valve.
13016 Eclair XL H with green large ergonomic control, polished chrome-plated with stop valve.
13060 Kit Eclair XL TC partition thickness 1 to 200 mm with stop valve.
13061 Kit Eclair XL TC partition thickness 200 to 300 mm with stop valve.
5) Version for renovation
13011 Eclair XL polished chrome-plated without stop valve.
13017 Eclair XL H green large ergonomic control, polished chrome-plated without stop valve.
13070 Eclair XL TC without stop valve (tap only).
Note: The flush cocks must be equipped with an individual shut-off valve
6) TECHNICAL CHARACTERISTICS:
-Feed M G 1'' ¼.
-Outlet tube connector D32 by compression seal (Part no. 10400).
-For model 13012, 13016 Shut-off valve and flow regulation ball valve.
-Supply volume = 9l at 0.8 bar.
7) WALL-MOUNTED INSTALLATION
8) Details
9) Tube D32
10) 400 min
11) CROSS PARTITION INSTALLATION
12) CROSS PARTITION CONTROL ACCORDING TO PARTITION THICKNESS
13) For fitting and adjusting the cross partition control, refer to its instructions.
14) ! Respect the direction of flow of the valve marked by an arrow on the body.
15) START UP
Bleed the pipes before fitting the valve.
In case of an operating anomaly, close the shut-off valve, unscrew the head and clean the mechanism with running water.
16) FLOW REGULATION
Depending on the pressure available, adjust the flow by adjusting the shut-off valve according to the attached flow curve.
Open delivery position.
17) OPEN
18) POSITION
19) CLOSED
20) FLOW RATE
21) PRESSURE
22) MAINTENANCE
Part no. 01250 Presto Eclair XL head
Part no. 01253 Presto Eclair XL TC NM head
Part no. 01252 Presto Eclair XL H-DV head
Part no. 90906 10 plug O-rings + 10 seat O-rings
Part no. 90907 5 full pistons XL, XL H-DV, XL TC
Part no. 90965 Bag of 5 springs for Eclair XL
Part no. 90966 Bag of full plugs Eclair XL head
Part no. 90967 Bag of full plugs Eclair XL DV-H head
23) Part no. 01250 Presto Eclair XL head
24) Part no. 01253 Presto Eclair XL TC NM head
25) Part no. 01252 Presto Eclair XL H-DV head
26) MAINTENANCE OF THE CARTRIDGE
27) 90966 (version XL and XL TC)
90967 (version XL DV and H)
28) This document is not contractual; we reserve the right to modify the characteristics of our products without notice.
29) PATENTED and REGISTERED MODELS