Descargar Imprimir esta página

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

1. Installation Preparation – Verify kit contents
DODGE RAM UNDER RAIL BEDLINER
Description
Under Rail Bedliner
Tailgate Cover
Installation Kit
READ ALL INSTRUCTIONS THOROUGHLY BEFORE
STARTING.
Improper installation may void warranty.
The manufacturer recommends using two people;
however bedliner can be installed by one person.
2. Tailgate Cover Installation
September 8, 2015
RAM BOX UNDER RAIL BEDLINER KIT
Qty.
Kit Contents:
2 self-tapping screws,
1
12 cap plugs,
1
Installation instructions
1
sheet
Tools Required:
PHILLIPS SCREW DRIVER
(For securing screws)
#30 TORX DRIVER
(For installing tailgate cover)
10MM SOCKET WRENCH
(For hex bolts in cargo management rails)
PORTABLE DRILL W/T20 TORX DRIVER
(For installing self-tapping screws)
TORQUE WRENCH
DE-BURRING TOOL
CLEANING:
Clean truck box and ensure floor drains (if applicable)
are clear to ensure ventilation and moisture drainage.
STEP 1 (FIGURE #1)
FIGURE #1
Using a #30 torx driver, remove and save eight (8)
screws from truck tailgate. Remove only the
screws
configurations.
(NOTE: Do not remove metal cover that is held
down by these 8 screws.)
FIGURE #2
STEP 2 (FIGURE #2)
Center the tailgate cover on the truck tailgate.
Press the cover down and forward into place. Line
up holes in tailgate cover with holes in truck
tailgate.
FIGURE #3
STEP 3 (FIGURE #3 & FIGURE #4)
Use the eight (8) screws, removed in Step 1, to
fasten the tailgate cover to the tailgate with #30
FIGURE #4
Torx Driver.
Torque specifications: 62 in lb +/- 4.4 in lb
(7 Nm +/- 0.5 Nm)
DO NOT USE POWER TOOLS.
indicated
by
"X"
1
www.mopar.com
for
all
tailgate
590053 Rev. 7
K6862360 Rev. 2

Publicidad

loading

Resumen de contenidos para Mopar RAM BOX

  • Página 1 RAM BOX UNDER RAIL BEDLINER KIT www.mopar.com 1. Installation Preparation – Verify kit contents Tools Required:  PHILLIPS SCREW DRIVER DODGE RAM UNDER RAIL BEDLINER (For securing screws)  Description Qty. Kit Contents: #30 TORX DRIVER 2 self-tapping screws, Under Rail Bedliner (For installing tailgate cover) ...
  • Página 2 3. Bedliner Installation CAUTION: It is recommended that two (2) people install the bedliner to avoid damage to the painted surface of the truck. (NOTE: If the front floor tie down plugs were not removed when cleaning the bed, remove them at this time.) There are multiple positions available for use with the cargo restraint gate.
  • Página 3: Herramientas Requeridas

    BEDLINER DODGE RAMBOX SIN RIEL INSTRUCTIVO DE INSTALACIÓN www.mopar.com 1. Preparación para la Instalación – Verificar el HERRAMIENTAS REQUERIDAS:  Contenido del Kit: Destornillador de Cruz (Phillips) (Para los tornillos de sujeción)  BEDLINER SIN RIEL DODGE RAM Destornillador Torx #30 Descripción...
  • Página 4 3. Instalación de Bedliner PRECAUCIÓN: Se recomienda que dos (2) personas instalen el bedliner para evitar daños a la pintura de la camioneta. (NOTA: Si los tapones para tie down no fueron removidos durante la limpieza de la caja, remuévalos en este momento.) Existen múltiples posiciones disponibles para ser utilizadas...
  • Página 5 TOURNEVIS À POINTE CRUCIFORME du nécessaire: (Pour la fixation des vis dans les chevilles)  CLÉ À EMPREINTE TORX N° 30 DOUBLURE DE CAISSE SANS REBORD POUR RAM BOX (Pour la pose du protège-hayon) Description Quantité Contenu du nécessaire: ...
  • Página 6 Pour accommoder le transport de cargaison il y a onze positions différentes. Trois de ces emplacements sont coupés pour être utilisés avec la doublure de caisse. Des bouchons de finition de 10 cm sont inclus dans le contenu du nécessaire pour couvrir ces ouvertures quand celles-ci ne...